Part Material: PC2245
Mold Steel: 2343
Key Requirement: High surface finish requirement
Mold Life: 500,000+ Shots
DFM Review: 3 Days
Mold Design: 7 Days After Data Freeze
Mold Manufacturing: 45 Days After Material Preparation Instruction Issued
T0 Trial: Based on Mold Complexity
Modification & Validation: According to Trial Results
Shipment: After Sample Approval
Reports: DFM, Mold Flow, CMM, Trial Report
Application: Tier 1 Supplier, Geely
Challenge:
The key requirement was to achieve a high-quality surface finish to meet the customer's appearance and optical requirements.
Solution:
Renxin applied precise machining, careful polishing, and strict surface inspection to ensure a smooth and consistent surface finish. This helped the final part meet the customer's appearance and quality standards.